- Overview
- Product Description
- Detailed Photos
- Packaging & Shipping
- FAQ
Basic Info.
Material
Iron
Surface Treatment
Phosphated
Application
Chemical Industry, Grain Transport, Mining Transport, Power Plant
Bore
Pilot Bore, Taper Bore
Material Code
Cast Iron Gg25
Transport Package
Export Wooden Box
Origin
Zhejiang
HS Code
8483900090
Product Description
Cast iron V belt pulley Cast Iron with Taper bore
With more than 15 years' experience, high-precision equipment and strict management system, CIMO can provide V belt pulley for you with stable quality and best service.
V belt pulley specifications:
V-Belt Pulley Type | Light Duty Bored to size Pulleys (AK,BK,2AK,2BK,3BK series) |
Light Duty Taper Bore Pulleys (AK-H,BK-H,2AK-H,2BK-H series) | |
Split taper bushed Pulleys (1TB,2TB,3TB series) | |
Heavy Duty QD Pulleys (1B,2B,3B,1C,2C,3C,4C,5C series etc) | |
Light Duty Variable Speed Pulleys (1VP,2VP,1VL,1VM series) | |
QD taper bore sheaves Pulleys (3V,5V,8V series) | |
Single Groove Pulleys (OK,OL,AL series) | |
According to customers' requirements or drawings | |
Materials | Cast iron, steel, aluminium ,alloy, ect. |
Surface treatment | powder coating, zinc plating, black oxided,etc |
Standard | ANSI.API.BS.DIN.JIS.GB.etc. |
Machine equipment | CNC center, CNC milling machine,CNC turning machine, CNC drilling |
machine, CNC lathes, lathe, 4 axis machine etc. | |
Application field | Equipment accessories, Airplane, Ship, Bicycle, Motorcycle, Auto, Medical,Chemical, Wheel, Sports, Anchor, Weapon, etc. |
Certification | ISO9001:2015 |
Warranty | One year after shippment |
QC | 1. Materials are to be checked carefully before production. |
2.Strict processing quality control | |
3.100% inspection before shipment. | |
Inspection Equipment | CMM, Projection, Calipers, Micro caliper, Thread Micro caliper;Automatic Two / Three Coordinate Measuring Instrument etc;Third party inspection avaliable upon customer's requirements |




SPB1000-4-4040

Large stock in warehouse



Workshop

Export wooden box


Q1: Are you trading company or manufacturer ?
A: We are factory.Q2: How long is your delivery time and shipment?
1.Sample Lead-times: 10-20 days
2.Production Lead-times: 30-45 days after order confirmed.
Q3: What is your advantages?
1. The most competitive price and good quality.
2. Perfect technical engineers give you the best support.
3. OEM is available.